亚洲中文日韩-亚洲中文日韩大片在线观看-亚洲中文日韩国产一区-亚洲中文三级情片在线观看-亚洲中文色欧另类欧美动图-亚洲中文少妇影视

Welcome to the official website of Shanghai Industrial Boiler Co., Ltd. / Shanghai Industrial Boiler (Wuxi) Co., Ltd.

Home
TEL:0510-88787772
Application areaEngineering generalcontractor Boiler modificationEquipment installation

Glass industry



The dry quenching technique utilizes a cold inert gas (combusted exhaust gas) to exchange heat with red hot red coke in a dry quenching furnace to cool the red coke. The inert gas that absorbs the heat of the red coke transfers the heat to the dry quenching boiler to generate steam, and the cooled inert gas is then circulated by the circulating fan into the dry extinguishing furnace to cool the red coke. The steam generated by the CDQ boiler is either incorporated into the steam pipe network of the plant or sent to generate electricity. In the reverse movement, the coke is gradually cooled to below 250 ° C, and then discharged by the unloading device at the bottom of the furnace; at the same time, the inert gas (or waste flue gas) is heated to about 800 ° C, passing through the dry quenching ramp After the primary dust collector, the boiler enters the dry quenching boiler; in the boiler, the water is heated by the hot air stream to generate steam, and the gas is cooled to about 200 ° C, and then re-supplied into the dry extinguishing furnace by the circulating fan through the secondary dust removal.
    

 

    
Glass kiln waste heat power generation process flow chart

The dry quenching technique utilizes a cold inert gas (combusted exhaust gas) to exchange heat with red hot red coke in a dry quenching furnace to cool the red coke. The inert gas that absorbs the heat of the red coke transfers the heat to the dry quenching boiler to generate steam, and the cooled inert gas is then circulated by the circulating fan into the dry extinguishing furnace to cool the red coke. The steam generated by the CDQ boiler is either incorporated into the steam pipe network of the plant or sent to generate electricity. In the reverse movement, the coke is gradually cooled to below 250 ° C, and then discharged by the unloading device at the bottom of the furnace; at the same time, the inert gas (or waste flue gas) is heated to about 800 ° C, passing through the dry quenching ramp After the primary dust collector, the boiler enters the dry quenching boiler; in the boiler, the water is heated by the hot air stream to generate steam, and the gas is cooled to about 200 ° C, and then re-supplied into the dry extinguishing furnace by the circulating fan through the secondary dust removal.
2018/08/16 14:44:43 16519

Related documents

Copy right ? 2018 Shanghai Industrial Boiler Co., Ltd.

Record number: Su ICP No. 18041342

主站蜘蛛池模板: 国产好大好爽久久久久久久 | 国产三级精品三级男人的天 | japanese精品 | 边吃奶边狠狠躁日韩A片 | 无码中文一区二区三区视频 | 色婷婷色丁香 | 视频一区国产 | 99久久精品免费国产一区二区三区 | 91精品啪在线观看国产九色 | 日韩在线播放泄欲 | 中文字幕字幕无码乱码在线 | 久久精品伊人波多野结衣 | 欧美一厂区二厂区三厂区区别在哪 | H狠狠躁死你H视频A片 | 欧美日韩亚洲一区二区三区在线观看 | 中国丰满少妇人妻xxx性董鑫 | 久久久噜噜噜久久熟女av | 狠狠色噜噜狠狠狠狠91 | 日本免费精品视频 | 久久精品久噜噜噜久久 | 亚洲精品无码A片一区二区三区 | 久久久无码一区精品亚洲日韩 | 日韩人妻少妇一区二区三区 | 日韩欧美国产免费看清风阁 | 国产精品成人国产乱 | 日韩欧美a∨中文字幕国产自产一区c | 天天操天天天 偷怕自怕影院 | 久久精品国产清自在天天线 | 99久久国产精品亚洲综合看片 | 国产精品亚洲欧美高清 | 国产网红美女人体在线 | 午夜婷婷精品午夜无码A片影院 | av无码精品一区二区三区宅噜噜 | 欧洲精品免费一区二区三区 | 日本成熟人妻理伦无码新片 | 97国产一区二区三区四区五区 | 欧美猛交XXX无码黑寡妇 | 亚洲综合AV在线在线播放 | xxxxxxx无码人妻精品一区二区三区 | 麻豆成人入口网站 | 欧美粗大特黄AAA片 欧美村妇激情内射 |